Our Works
Water supply and sewerage Wastewater Management System

Design and Build Negotiated Contract for Kuching Wastewater Management System ; Centralized Sewerage System for Kuching City Centre (Package 1)

Location
Malaysia
Completed Year
2015
Ordering
Government of Sarawak State
Design
Jurutera JASA (Sarawak) Sdn Bhd/CH2M Hill Singapore Pte Ltd. Consortium
Construction
1.Trunk Main, Dia.1,500mm & 1,200mm
  ①Pipe Jacking L=7.8km
  ②Shaft, MH 56nos.
2.Secondary Line, Dia.600mm & 450mm
  ①Pipe Jacking L=5.4Km
  ②Shaft, MH 94nos.
3.Tertiary Line, Dia.300mm & 225mm
  ①Pipe Jacking L=13.7Km
  ②Open Cut L=37.6Km
  ③Manhole 1,348nos.
4.Property Connection
  ①Small Property 2,708Lots
  ②Large Property 127Buldgs.
5.Sewerage Treatment Plant
  ①Sand Filling 105,000m3
  ②Spun Piles, Dia. 450mm & 300mm 837nos.
  ③Excavation 35,000m3
  ④Structural Concrete 14,500m3
  ⑤Reinforcement Bar 2,714ton
  ⑥Treatment Plant for 100,000PE