
- Our Works
-
Roads PC Bridge
Ryufukuji Bridge, Public City Planning Road No. 3.1.2
- Location
- Chiba
- Completed Year
- 2005
- Ordering
- Urban Renaissance Agency Chiba Area Branch
- Construction
- PC Bridge (Village Road Ryufukuji Line)
Abutment (2 units)
RC pile foundation: Dia. 1.2 m, depth 15.0 - 24.0 m, height 9.0 m
Bridge pier (2 units)
RC pile foundation: Dia. 1.2 m, depth 19.5 - 20.0 m, height 9.4 m
Bridge superstructure (3-span continuous T-girder bridge)
Bridge length: 71.0 m
Maximum span: 29.1 m