Our Works
Roads Tunnel

Tsuda Tunnel

Location
Kagawa
Completed Year
1997
Ordering
Shikoku Regional Development Bureau, Ministry of Construction
Construction
Road tunnel (National Road)
Cross-sectional area: 62 m2
Length: 977 m
Long piperoof and injection-type fore-piling was carried out as the tunnel entrance of starting point was located beneath a local road without sufficient overburden.